Resources

Our Process & Materials

Our Process
Products Used
Colors/Patterns
Glossary

With our "Price Match Guarantee," if you come across another contractor that offers a lower price for deck systems, we will price match the items on the competitors offer. For more information visit our Price Match Guarantee page.

  • Direction icon
    AL System
  • Direction icon
    FM System
  • Direction icon
    MC System
  • Direction icon
    Flex Restoration System
  • Direction icon
    Crete Texture/Overlay System
  • Direction icon
    Decking System

West Coast Decking AL System

The West Coast Decking AL Walking System has been an industry standard for over a decade. For those looking for strength, durability and design, this system is perfect for any high traffic walking areas. Constructed from Class A fire retardant materials, the West Coast Decking AL System has a 1- Hour Fire Rating (ASTM-E108) and is ICC ES (ER #5416) code-compliant.

Commercial icon

Step 1

A layer of waterproofing is applied to the plywood seams

Commercial icon

Step 2

A galvanized metal lath is attached directly to the plywood

Commercial icon

Step 3

A concrete and acrylic based slurry is distributed evenly around the work area

Commercial icon

Step 4

The customer’s selected top coat color and additional waterproofing is applied

*4-6 hours of drying time is required before light pedestrian traffic is allowed and a full 24 hours before heavy objects are placed on the work area.

*2-6 hours of drying time depending on weather.

West Coast Decking FM System

The West Coast Decking FM System is the premier waterproofing system for above ground decks. This all acrylic system is designed to not only be waterproof, but it is also flexible, long lasting, fireproof and skid resistant. The West Coast Decking FM System can be applied to plywood, concrete, magnesite or metal deck designs and is perfect for anyone looking to keep their deck, dry, safe and looking.

Commercial icon

Step 1

A layer of West Coast Decking Primer is applied to the work area. Once dried a 2nd coat in base coat resin.

Commercial icon

Step 2

A West Coast Decking Polyurethane Caulk and Seam Tape is applied to all seams to improve

Commercial icon

Step 3

If the work area is uneven a cement and resin can be applied to create a smooth

Commercial icon

Step 4

Fiberglass is frayed and placed over the work area, and a Base resin coat is applied

Commercial icon

Step 5

The texture coat is applied giving the deck its final appearance

Commercial icon

Step 6

The customer’s selected top coat color and additional waterproofing is applied

*Allow 4-6 hours or more of drying time. Additional time may be required depending on weather condition before light pedestrian traffic is allowed and a full 24-48 hours before heavy objects are placed on the work area.

*2-6 hours of drying time depending on weather.

West Coast Decking MC System

The West Coast Decking MC System is a fiber reinforced deck system designed for concrete and magnesite floorings. This system is ideal for areas with heavy foot traffic, like balconies, corridors and stairs and landings. This system is quick to set for minimal downtime before the area can return to normal traffic. The West Coast Decking MC System is not only waterproof, it is
strong, flexible and has a UV resistance and Safe anti-skid finish.

Commercial icon

Step 1

Fiberglass is frayed and placed over the work area, and a Base resin coat is applied

Commercial icon

Step 2

The texture coat is applied giving the deck its final appearance

Commercial icon

Step 3

The customer’s selected top coat color and additional waterproofing is applied

Commercial icon

Step 4

Fiberglass is frayed and placed over the work area, and a Base resin coat is applied

Commercial icon

Step 5

The texture coat is applied giving the deck its final appearance

Commercial icon

Step 6

The customer’s selected top coat color and additional waterproofing is applied

*2-6 hours of drying time depending on weather.

West Coast Decking Flex Restoration System

West Coast Decking Flex is a deck restoration system that is design to restore the original integrity of an existing walking deck system plus increase it's waterproofing characteristics. This will enhance the overall aesthetic appeal of any building. This system utilizes high quality acrylic resins combined with premium fiberglass reinforcement, followed by a handsome knockdown troweled finish.

Commercial icon

Step 1

Apply bonder and fiberglass matting to the existing deck surface. Allow 24 hrs for drying.

Commercial icon

Step 2

Apple a thin troweled application of texture thoroughly mixed with liquid polymer. A liquid polymer must be used without diluting with water.

Commercial icon

Step 3

Apply texture thoroughly mixed with liquid polymer by using a pneumatic hopper gun equipped with an 1/8th orifice and a circular spray plate. Allow 5-10 minutes before knocking down the splatter texture with a steel trowel.

Commercial icon

Step 4

Apply 1-2 coats pigmented concrete masonry floor paint and sealer. Allow 24-48 hours between coats. Periodically maintain system by applying a coat of pigmented CMFPS.

*2-6 hours of drying time depending on weather.

Crete Texture/Overlay System

This system is a polymer modified resurfacing system for aged or newly poured concrete surfaces. This texture overlay is designed to repair driveways, patios, pool decks, entry ways, and walk ways and provide a hard wearing attractive finish.

Commercial icon

Step 1

Mix all powders and liquids with the "Jiffy" type mixing paddle. All materials for a minimum of 5 minutes for a smooth, lump-free consistency.

Commercial icon

Step 2

Apply a trowelled application of pigmented texture, thoroughly mixed with liquid over the deck to prime and smooth the surface. Allow trowelled application to dry thoroughly before proceeding.

Commercial icon

Step 3

Apply appropriate tape or stencils over cured bond coat and cut to finish. Mask adjacent surfaces not to receive coating.

Commercial icon

Step 4

Apply pigmented texture fully mixed with liquid polymer or easy deck acrylic, by trowel or by using a pneumatic hopper gun equipped with an 1/8th orifice and a medium setting in the circular spray paint. Allow 5-10 minutes before knocking down the splatter texture with the steel trowel. Allow drying before removing tape or stencils.

Commercial icon

Step 5

Apply 2 coats of clear sealer CMFPS, Paver Sealer, Master Seal 100 or Master Seal WB. Follow chosen sealer directions closely before allowing any foot or vehicle traffic.

*2-6 hours of drying time depending on weather.

West Coast Deck Decking System

Commercial icon

Step 1

After all required flashing is in place, thoroughly secure hot-dipped galvanized metal lath upon the wood sub-floor. Lap metal lath sheets together a minimum of 1 in and lap all metal flashings with lath up to 1/4 in - 1/2 in from the vertical riser of the flashing.

Commercial icon

Step 2

Mix all powder and liquids with the "Jiffy" type mixing paddle. Mix all materials to a smooth lump free consistency.

Commercial icon

Step 3

After mixing, trowel poly base into the metal lath. Make certain that all holes in the lath are filled to the top of the lath. Allow to dry thoroughly before proceeding.

Commercial icon

Step 4

Lay fiberglass mat onto surface. Lap fiberglass over flashing at seams. Cut fiber glass to fit around post and drains.

Commercial icon

Step 5

Generously apply bonder by working into fiberglass matting. Bonder is designed to penetrate and soak through the matting; thereby adhering the matting to the surface. Allow 24 hrs to dry thoroughly before proceeding.

Commercial icon

Step 6

Trowel a second application of poly based over the dried fiberglass and bonder. Allow to dry thoroughly before proceeding.

Commercial icon

Step 7

Apply texture by using a pneumatic hopper gun equipped with an orifice and a circular spray plate. Allow 5-10 minutes before knocking down the splatter texture with a steel trowel. Allow 2 hours for drying.

Commercial icon

Step 8

Apply 2 coats of pigmented concrete masonry floor paint and sealer (CMFPS). Allow 2-3 hours between coats. Periodically maintain system by applying a coat of pigmented CMFPS as needed.

*2-6 hours of drying time depending on weather.

In order to guarantee the highest quality work, West Coast Deck Waterproofing uses the highest quality products to guarantee customer satisfaction. We also apply coats and decorative finishes in a variety of textures, designs and colors, using ICC approved systems such as:

  • Direction icon
    Desert Brand Product
  • Direction icon
    Poly-Tuff System
  • Direction icon
    Pacific Polymers
  • Direction icon
    Life Paint Specialty Coatings
  • Direction icon
    Others Brands

Our West Coast Deck branded deck systems offer the most reliable and long lasting protection for any deck or walkway application. These heavy duty systems are perfect for residential or commercial properties that are looking for professional waterproofing without sacrificing aesthetic appeal or quality.

Products Used

Desert Flex is a cost-effective solution for waterproofing and restoring a variety of existing deck systems. Perfect for those looking to protect their walkways and balconies from heavy foot traffic or waterproof their swimming pool and rooftop decks and give them a great new look.

Advantages:

  • Fast drying system will reduce down time for walkways and decks and minimize impact on tenants.
  • Restores old decks to like new quality for a fraction of the price of replacing the entire system.
  • The heavy duty construction is easy to maintain and clean, which will reduce damage and wear over the life of the deck.
  • A variety of Decorative finishes and colors are available to match the unique look of the building.
dryvit
ardex
upi
tremco
life paint
desert brand
carlisle construction equipment
bdc epoxy systems
polycoat products
avm industries
pli-deck
aquafin

Desert Crete for Plywood Subfloors

Desert Crete is the ideal solution for any deck or walkway in a private or commercial setting. Popular with HOA’s, Apartment Complexes, Hotels and residential homes. This is used for high traffic and with an aesthetic curb appeal.

Commercial icon

Step 1

A layer of Desert Brand Deck Primer is applied to the work area. Once dried a 2nd coat in

Commercial icon

Step 2

A Desert Brand Deck Polyurethane Caulk and Seam Tape is applied to all seams to improve

Commercial icon

Step 3

If the work area is uneven a cement and resin can be applied to create a smooth

Commercial icon

Step 4

Fiberglass is frayed and placed over the work area, and a Base resin coat is applied

Commercial icon

Step 5

The texture coat is applied giving the deck its final appearance

Commercial icon

Step 6

The customer’s selected top coat color and additional waterproofing is applied

*Allow 4-6 hours or more of drying time. Additional time may be required depending on weather condition before light pedestrian traffic is allowed and a full 24-48 hours before heavy objects are placed on the work area.

Desert Crete Texture Overlay System

Desert Crete Texture/Overlay is ideal for surfacing aged or newly poured concrete surfaces and can be used to attractively finish Desert Crete or Desert Flex. This High Quality interior and exterior surfacing system employs high performance acrylic modified cements combined with a unique pigmentation process for color enhancement while utilizing state of the art patterns, surface textures and designs that can be used in countless ways, even walls!

Commercial icon

Step 1

A layer of Desert Brand Deck Fiberlath mesh is applied to the work area and laminated to the surface.

Commercial icon

Step 2

Once dry, a slurry mixture of cement and resin is applied to the Fiberlath layer covering the work area.

Commercial icon

Step 3

An optional pattern may be applied to give the deck a unique look based on the customer’s specifications.

Commercial icon

Step 4

A texture coat made up of cement and resin is applied to give the deck its final appearance.

Commercial icon

Step 5

The customer’s selected top coat color and additional waterproofing is applied.

Life Paint Systems

Life Paint Specialty Coatings is the manufacturer of high performance waterproof decking, epoxy coatings, concrete resurfacing, stain and sealer products. Well known for lowering V.O.C. , Volatile Organic Compounds, removing known carcinogens and developing APEO free products with high performance standards.

life paint fm system - 2

Life Deck FM System

The Life Deck FM System is the premier waterproofing system for above ground decks. This all acrylic system is designed to not only be waterproof, but it is also flexible, long lasting, fireproof and skid resistant. The Life Deck FM System can be applied to plywood, concrete, magnesite or metal deck designs and is perfect for anyone looking to keep their deck, dry, safe and looking good. The advantages to this system is that it is Low Maintenance, Fast Drying and Durable.

Life Deck MC System

The Life Deck MC System is a fiber reinforced deck system designed for concrete and magnesite floorings. This system is ideal for areas with heavy foot traffic, like balconies, corridors and stairs and landings. This system is quick to set for minimal downtime before the area can return to normal traffic. This is ideal and is heavily utilized for Hotels, Condominiums, Apartments and Office Buildings. The Life Deck MC System is not only waterproof, it is strong, flexible and has a high UV resistance and a Safe anti-skid finish The advantages to this system are strong flexibility, strength and durability which a choice of color and texture giving a high curb appeal.

MC System

Colors

Patterns

American Flagstone

Baltimore Brick

Basket Weave

Brick Ribbon

Fanfare

Herrinbone

King’s Slate

Norman Cobbles

Palos Verdes Stone

Sante Fe

Satillo Tile

Serpentine

Glossary

West Coast Deck Waterproofing is your deck, balcony, pool deck and waterproofing resource. Check out our "Glossary of Decking" terms so you can become as educated as you like about our applications. We believe the more you know about our services the more you will appreciate our work. With us you do not need to be concerned about codes, fire ratings or other technical parts of your new deck. We have you covered. All of our systems, materials, assemblies meet local, state and federal codes and guidelines.

Balcony

The same as a deck, usually with closed in outside walls.

Cement System

A multi ply assemble of, metal lath stapled (big roofing staples) directly to plywood decks, balconies, walkways, landings or stairs. Once the metal lath is attached a layer of cement is applied in a smooth coat. After the metal lath and cement, a layer of liquid acrylic resin is applied with fiberglass (yes just like a boat or surfboard) is applies fully soaking the fiberglass. When dry this is what makes your deck surface waterproof. Over that, another coat of cement based texture is trowelled on and allowed to dry. The final steps is a texture coat applied with an air powered hopper creates an "orange peel" texture which can be trowelled while still wet into a "knockdown' surface just like your walls in your house. The final step is to apply the surface coating of acrylic paint in a variety of colors.

Cricket

This term refers to the area on a deck which is raised usually in a triangular shape to divert water towards the drains or scuppers.

Deck Drains

Metal drains usually in the center of the deck normally with a metal grid on the surface

Deck

A second floor (or above) outside living space usually outside a living room or bedroom. Usually has a steel or wood guardrail system.

Dekoseal

This is a product used to seal the concrete pool deck or other large expansion joints in concrete.

Door Pan

​A piece of sheet metal made to go under the threshold of the exterior doors that prevents water from leaking under the doors or existing threshold. It has a small vertical lip on the inside that prevents water from flowing in.

Epoxy Floor Coatings

Popular with garage flooring, Epoxy coating will not only protect your concrete but make oil spills much easier to clean up. Glossy epoxy floors are common in food plants, labs, auto service bays and many other locations. Garage floors in residential properties are often coated with epoxy to improve appearance, resist oil and grease stains. Be very careful to engage a professional in epoxy coatings as many big box home improvement stores sell cheap floor products which are not suitable for hot auto tires (when you come home) and may discolor, wear through or peel.

Flashing

Sheet metal that makes a solid connection between the horizontal surfaces and the vertical surfaces like a stucco or wood exterior wall. Also the metal on the edge of the deck where it is open on the outside.

Floor Joists

This term refers to the actual framing that usually extends from inside your units floor outside the building to support the balcony or deck.​ These structural beams sometimes rot and must be replaced to provide a solid walking surface and a suitable surface to anchor your new deck coating system.

Iron rail base plate

This is the square plate on the hand rail post that actually connects the deck to the rail. These often rust and must be replaced.

Landing

The small area at the top of stairs.

Patio

A first floor outside living space usually made concrete or pavers, not a waterproof surface. Still suitable for decorative surface coating and non skid surfaces.

Plywood Repair

When plywood decks (under waterproof deck) sustains moisture damage from leaks on a damaged or cracked deck, the plywood rots and must be replaced to provide a solid walking surface and a suitable surface to anchor your new deck coating system.

Ponding

Ponding is the areas on a deck where water stands after a rain or a good wash down. Some ponding is normal where large decks are applied and very little slope is present. It is considered normal if the water that remains is less than 1/8" in depth and dries up within 24 hours after water is applied.

Pool Deck

Usually a concrete area around your pool that is cracked, lifting or just plain ugly

Restoration system

Applied over existing decks that are in generally good condition. This system is just like the "Cement System" ​but without the removal, metal lath and concrete base coat.

Scuppers

Scuppers are normally sheet metal tubes that go through the wall to allow water to escape the desk area. Sometimes they are the only drainage and sometimes they are used as emergency overflows so if the drain is blocked the scupper will allow drainage.

SikaFlex

Caulking used to repair cracks under the new coating system

Slope

Slope is the angle of the deck that allows water to run off the edge or into the drains. Sometimes the slope is actually framed into wood buildings and other times on concrete buildings it must be achieved by the application of additional concrete compounds to make sure the water runs off or to the drains properly.

Walkway

A common, usually narrow entry to multiple upstairs units.

Got a Project?
Contact Us for a FREE Quote!
Get A Quote